{"id":12108,"date":"2026-04-02T10:25:57","date_gmt":"2026-04-02T08:25:57","guid":{"rendered":"https:\/\/www.schoenenberger-systems.com\/faq-items\/what-is-the-minimum-ceiling-height-required\/"},"modified":"2026-04-02T10:25:57","modified_gmt":"2026-04-02T08:25:57","slug":"what-is-the-minimum-ceiling-height-required","status":"publish","type":"avada_faq","link":"https:\/\/www.schoenenberger-systems.com\/en\/faq-items\/what-is-the-minimum-ceiling-height-required\/","title":{"rendered":"What is the minimum ceiling height required?"},"content":{"rendered":"<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">The required ceiling height depends on the selected system and the application:<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"><strong>Minimum heights:<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"whitespace-normal break-words pl-2\"><strong>Omniflo system:<\/strong> From 3.5m ceiling height<\/li>\n<li class=\"whitespace-normal break-words pl-2\"><strong>ILS 2100:<\/strong> From 3.8m for standard applications<\/li>\n<li class=\"whitespace-normal break-words pl-2\"><strong>ILS pocket sorter:<\/strong> Recommended from 4.0m<\/li>\n<li class=\"whitespace-normal break-words pl-2\"><strong>CPC systems:<\/strong> Possible from 3.2m<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"><strong>Optimum heights for ASRS integration:<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"whitespace-normal break-words pl-2\">6-12m: Standard high-bay warehouse<\/li>\n<li class=\"whitespace-normal break-words pl-2\">12-20m: High-performance ASRS systems<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Over 20m: special solutions possible<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"><strong>To be considered:<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"whitespace-normal break-words pl-2\">Clearance height under conveyor section (min. 2.2 m)<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Maintenance access above<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Height of the transported goods<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Workstation ergonomics<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\"><strong>Solutions for low ceilings:<\/strong><\/p>\n<ul class=\"[li_&amp;]:mb-0 [li_&amp;]:mt-1 [li_&amp;]:gap-1 [&amp;:not(:last-child)_ul]:pb-1 [&amp;:not(:last-child)_ol]:pb-1 list-disc flex flex-col gap-1 pl-8 mb-3\">\n<li class=\"whitespace-normal break-words pl-2\">Floor mounting with gantry constructions<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Partial subsidence in secondary areas<\/li>\n<li class=\"whitespace-normal break-words pl-2\">Optimized carrier geometry<\/li>\n<\/ul>\n<p class=\"font-claude-response-body break-words whitespace-normal leading-[1.7]\">SCH\u00d6NENBERGER plans individually for your room situation and finds solutions even for challenging conditions.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The required ceiling height depends on the selected system and the application: Minimum heights: Omniflo system: From 3.5m ceiling height ILS 2100: From 3.8m for standard applications ILS pocket sorter: Recommended from 4.0m CPC systems: Possible from 3.2m Optimum heights for ASRS integration: 6-12m: Standard high-bay warehouse 12-20m: High-performance ASRS systems Over 20m: special solutions possible To be considered: Clearance height under conveyor section (min. 2.2 m) Maintenance access above Height of the transported goods Workstation ergonomics Solutions for low  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"open","ping_status":"closed","template":"","format":"standard","meta":{"footnotes":""},"faq_category":[329],"class_list":["post-12108","avada_faq","type-avada_faq","status-publish","format-standard","hentry","faq_category-technical-specifications"],"_links":{"self":[{"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/avada_faq\/12108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/avada_faq"}],"about":[{"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/types\/avada_faq"}],"author":[{"embeddable":true,"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/comments?post=12108"}],"version-history":[{"count":0,"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/avada_faq\/12108\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/media?parent=12108"}],"wp:term":[{"taxonomy":"faq_category","embeddable":true,"href":"https:\/\/www.schoenenberger-systems.com\/en\/wp-json\/wp\/v2\/faq_category?post=12108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}